Load Bank Testing from Power Depot
Load Bank Testing is critical to extending the life of the generator and keeping the unit in peak performance. This test mimics the operational load that a stand-by generator receives in the event of a power outage.
The Benefits:
- Fully test generator without interrupting normal utility services
- Ensure the engine cooling system performs as designed
- Cleans carbon deposits from the exhaust system and turbochargers to offset “wet stacking” by loading the generator to 100% capacity
Required by law per National Fire Protection Association (NFPA) Code 110 for life safety electrical power needs.
Also in News
Happy 4th of July from Power Depot!
On behalf of the entire Power Depot team, we would like to wish you a Happy Fourth of July! We hope you enjoy good food, great company, and fun festivities as we celebrate America’s birthday and our nation’s historic 250th anniversary.
Save the Date: Power Depot Open House — Friday, July 17, 2026!
You're invited to an exclusive event hosted by Power Depot, celebrating the launch of the new Rehlko KD Series™ 80-600 kW.